Total development cost
$92.97M+4.7%+$4,205,401 over $88.77M underwritten. Hard cost $73.91M.
Development Intelligence Engine
Built on 35 risk areas, 178 aspect report cards and 1,577 control points, ClaimZero is designed to turn project data into clear, actionable intelligence, giving owners the real story behind cost, schedule and risk, with every finding traceable to its source.

THE DELIVERABLE · EVERY MONDAY MORNING
Starting Monday morning, you read it first. It comes straight to you.
The party being measured no longer writes the report. Each edition is graded, traced to source fields and signed by a named project executive who verified it. Not software: a person.
EVERYTHING BEHIND THE WEEKLY EDITION
Live risk indicators on one screen. Every metric source-traced.
Twelve reports on one screen, all printable, led by the weekly edition.
Full project document checklist. Status tracking. Upload & tag.
4-line divergence analysis: planned, billed, built, and loan drawn.
178-aspect report cards across 35 risk areas. Graded A–F with reviewer signature.
METHODOLOGY
Every figure on this platform is engine-computed from a cited source, carries a provenance state, and is reviewed and signed by a named, credentialed reviewer before release. Absence of evidence is reported as a gap, never as a clean result.
Every applicable aspect is assessed. A grade computed before every applicable aspect is scored is marked Provisional, with the missing items listed; with nothing scored it reads Not assessed.
The owner’s advantage
What threatens the investment, what is changing,
and what decision is needed?
See where capital is committed, what is changing, and which decisions need your attention.
Start with total project cost, then read leverage, equity, returns and delivery together. This private-development simulation shows the full capital picture; the measures relevant to a campus, airport or private development depend on its funding model and the owner’s mandate.
Illustrative private-development example · not an institutional project assessment
Budget, equity & returns
+$4,205,401 over $88.77M underwritten. Hard cost $73.91M.
Against 13.67% underwritten. Unlevered 8.63%.
$30.75M back on $22.81M in. Underwritten 1.477×.
Equity first, then debt. Underwritten $21.20M.
Margin 7.9% of $100.92M net sellout; return on cost 8.5%.
Billed 81.5% · measured 72.7% · plan 73.3% · drawn 64.1%.
Leverage, funding & carry
$61.00M on $92.97M; 70% covenant. With URA TIF note: 76.69%.
66% covenant. No appraisal in the record; net sellout stands in for value.
Conversion needs $20,179,697 paydown ≈ 52 conveyances.
$1,222,175 accrued; model total $3,790,352 through payoff.
90% release of net proceeds retires the senior loan before maturity.
$20,604/day at peak balance. General conditions: $285,000/month.
Cost, sales & owner decisions
11 executed: 10 owner-responsible, 1 shared, none contractor.
$2,724,150 budget against $4,061,000 executed change orders.
In contract. Underwriting floor 7.0/month; presale threshold of 81 met.
No native file or update for 428 days. Float and critical path cannot be computed.
Five unbounded conditions converted to priced change orders: $1,765,000.
8 HIGH or CRITICAL. 30 decisions closed; D-035 remains open.
Total development cost · source bridge, rounded values
Red adds cost; green removes it. Source chart values are rounded; the contingency step is released budget, not the separately stated owner-contingency overrun.
Sample report · supplied C1 Investment Command Center · R0 draft · all 18 indicators retained.
Open Full Report ↗The owner’s story, backed by reports you can open and explore.
Start with the question you need answered: feasibility, cost, schedule or readiness to occupy. Explore the full-size reference to see how those questions connect to focused reports and the records behind them.

Historical Report Room reference · open the complete image at full size.
Open full-size image ↗Understand the exposure. See the evidence. Know your next move.
Move from the overall picture to the specific area that needs attention. Search the sample dashboard, open an area and follow the issue through its owner consequence, next decision and evidence needed.
Scroll or search all 35 areas. Cards show a concise view; Open area reveals the full context, decision and records to inspect.
Open the full sample dashboard ↗See where the plan and reality diverge, and what that means for your investment.
Look at the gaps between planned progress, billing, measured work and loan draws—not just the headline totals. Open the full-size graphic and use the monthly bars to frame questions about timing, funding and the records needed to explain a divergence.

Historical simulation · complete Development Curve and monthly draw profile.
Open full-size graphic ↗